Show on map
Quincy II Solar Garden — Power plant · Solar · Onsite Partners, LLCJPMORGAN CHASE - PROJECT SYCAMORE AURORA — Built · Large load · CO · 6.6 mi awayDEN1-DC2 (Aurora data centre) — Filed · Large load · CO · 7.1 mi awayQTS AURORA LLC - QTS DEN1 — Built · Large load · CO · 7.2 mi awayPivot Solar 43 LLC — Under construction · Solar · CO · 3.5 MW · 7.6 mi awayPivot Solar 53 LLC — Under construction · Solar · CO · 4 MW · 7.6 mi awayAPA060 - Phase 5 MDC (Aurora data centre) — Built · Large load · CO · 7.7 mi awayAMAZON DATA SERVICES - DEN-22 — Built · Large load · CO · 8.6 mi awayFlexential DEN 12 Data Center - Parker — Filed · Large load · CO · 9.7 mi awayTING FIBER DATA CENTER — Built · Large load · CO · 10.0 mi awayFLEXENTIAL - DEN03 DATA CENTER — Large load · CO · 10.1 mi awayFlexential -Denver -Centennial Data Center — Filed · Large load · CO · 10.1 mi awayCrane DataBank — Built · Large load · CO · 10.3 mi awayONENECK IT-DENVER DATA CENTER — Built · Large load · CO · 10.7 mi awayFLEXENTIAL CORP - COMPARK DATA CENTER — Built · Large load · CO · 10.9 mi awaySAMARITANS PURSE DATA CENTER — Built · Large load · CO · 11.3 mi awayNISSAN N. AMERICA - NISSAN DATA CENTER — Built · Large load · CO · 11.6 mi awayEQUINIX DATA CENTER — Filed · Large load · CO · 11.7 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Quincy II Solar Garden

Power plant · Solar

Key facts

Power plant · Solarran 27% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2025
3,604 MWh
Grid
13 kV to Public Service Co of Colorado (PSCO)
Location
Arapahoe County, Colorado
Operated by
Onsite Partners, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2018 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
8 years since 2018
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000817394
Location id
L100000814603
Eia plant ids
61752
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
13.20
Transmission owner
Public Service Co of Colorado
Balancing authority code
PSCO
Balancing authority name
Public Service Company of Colorado
Fuel burned (MMBtu), 202512,297
Capacity factor, 20250.274
Net generation (MWh), 20253,604
Balancing authority codePSCO

Solar arrays

Array area (acres)
21.3
AC capacity (MW)
1.5
DC capacity (MW)
1.9
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2018

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
JPMORGAN CHASE - PROJECT SYCAMORE AURORA Built Large load 6.6 mi
DEN1-DC2 (Aurora data centre) Filed Large load 7.1 mi
QTS AURORA LLC - QTS DEN1 Built Large load 7.2 mi
Pivot Solar 43 LLC Under construction Solar 7.6 mi 3.5
Pivot Solar 53 LLC Under construction Solar 7.6 mi 4
APA060 - Phase 5 MDC (Aurora data centre) Built Large load 7.7 mi
AMAZON DATA SERVICES - DEN-22 Built Large load 8.6 mi
Flexential DEN 12 Data Center - Parker Filed Large load 9.7 mi
TING FIBER DATA CENTER Built Large load 10.0 mi
FLEXENTIAL - DEN03 DATA CENTER Unknown Large load 10.1 mi
Flexential -Denver -Centennial Data Center Filed Large load 10.1 mi
Crane DataBank Built Large load 10.3 mi
ONENECK IT-DENVER DATA CENTER Built Large load 10.7 mi
FLEXENTIAL CORP - COMPARK DATA CENTER Built Large load 10.9 mi
SAMARITANS PURSE DATA CENTER Built Large load 11.3 mi
NISSAN N. AMERICA - NISSAN DATA CENTER Built Large load 11.6 mi
EQUINIX DATA CENTER Filed Large load 11.7 mi

Sources EPA ICIS-Air · FAA OE/AAA · EIA-860M · EPA ICIS-NPDES

Sources

Attribution