Show on map
- Combustion
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
Racine - Mount Pleasant 345 kV: route and 11 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Racine - Mount Pleasant 345 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 345 kV
- States crossed
- US-WI
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 4
- Substations at the ends (as the source names them)
- Racine to Mount Pleasant
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| HIFLD line ID | 179691 |
| Voltage class | 345 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| MICROSOFT CORPORATION - MKE 3B DATA CENTER Built | Large load | 0.2 mi | |
| 2250 (Racine data centre) Filed | Large load | 0.4 mi | |
| MLC 300 (Racine data centre) Filed | Large load | 1.5 mi | |
| Red Oak Ridge Energy Center LLC Studied | Gas, other | 4.2 mi | 1,211.2 |
| Root River Solar WI, LLC Filed | Solar | 8.4 mi | 6 |
| South Oak Creek Filed | Gas, combustion turbine | 9.8 mi | 1,181.5 |
| Tichigan Solar WI, LLC Filed | Solar | 13.3 mi | 6 |
| Zion Energy Center Postponed | Gas, combustion turbine | 13.8 mi | 397.8 |
| NL IL Lake Under construction | Solar | 14.7 mi | 5 |
| IL - Renewable Properties - Bobcat - Wes Under construction | Solar | 14.8 mi | 4.5 |
| Cenergy IL - Zion Park District Under construction | Solar | 14.8 mi | 2.3 |
Sources EPA ICIS-Air · FAA OE/AAA · EIA-860M · Berkeley Lab
Sources
- EPA ICIS-Air
- FAA OE/AAA
- EIA-860M
- Berkeley LabLawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.