Show on map
Radford Army Ammunition Plant — Power plant · Gas, steam turbine · U.S. Army - RadfordHecate Energy Pulaski 1 — Filed · Solar · VA · 150 MW · 8.4 mi away
  • Combustion
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Radford Army Ammunition Plant

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 20% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1990
Net generation, 2025
31,985 MWh
Grid
69 kV to Appalachian Power Co (PJM)
Location
Montgomery County, Virginia

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
36 years since 1990
Unused energy
126 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000601867
Subparts reported
C
NAICS code
325920
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001818
Fuel burned (MMBtu), 20253,726,704
Capacity factor, 20250.203
Net generation (MWh), 202531,985
Balancing authority codePJM
Data notes (1)
  • Heat rate (Btu/kWh), 2025 not shown: computed 116514.1 outside 5000-30000 Btu/kWh

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
6 MW
Generators retired
1
Capacity still in service
18 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN4Natural Gas Steam Turbine6 MWRetiredJanuary 2012

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
69 kV
Transmission or distribution system owner
Appalachian Power Co
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleAs ofSource
U.S. Army - Radford Operator EIA-860M
U.S. Government Owner Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Unit GEN4 scheduled to retire, 6 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Hecate Energy Pulaski 1 Filed Solar 8.4 mi 150

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution