Show on map
RavenChem — Power plant · Gas, reciprocating engine · Generate ER-NG, LLCConeflower Storage Project LLC — Contracted · Storage · TX · 170.8 MW · 2.5 mi awayGCCISD NEW TECHNOLOGY DATA CENTER — Large load · TX · 3.6 mi awayCedar Bayou 5 — Under construction · Gas, combustion turbine · TX · 697 MW · 4.8 mi awayNoor Solar — Filed · Solar · TX · 188.2 MW · 6.9 mi awayBaytown — Postponed · Biomass · TX · 1.3 MW · 10.1 mi awayTX LaPort 10060 Porter Road Solar — Postponed · Solar · TX · 1.6 MW · 12.9 mi awayNET Power La Porte Station — Studied · Gas, combustion turbine · TX · 25.5 MW · 14.7 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 2% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
422 MWh
Grid
138 kV to CenterPoint Energy (ERCO)
Location
Harris County, Texas
Operated by
Generate ER-NG, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2022 to 2025
Fuel burned MMBtu by year, 2022 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
5 years since 2021
Unused energy
28 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
16,002 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
CenterPoint Energy
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20256,753
Capacity factor, 20250.015
Heat rate (Btu/kWh), 202516,002.4
Net generation (MWh), 2025422
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Coneflower Storage Project LLC Contracted Storage 2.5 mi 170.8
GCCISD NEW TECHNOLOGY DATA CENTER Unknown Large load 3.6 mi
Cedar Bayou 5 Under construction Gas, combustion turbine 4.8 mi 697
Noor Solar Filed Solar 6.9 mi 188.2
Baytown Postponed Biomass 10.1 mi 1.3
TX LaPort 10060 Porter Road Solar Postponed Solar 12.9 mi 1.6
NET Power La Porte Station Studied Gas, combustion turbine 14.7 mi 25.5

Sources ERCOT · EIA-860M · EPA ICIS-NPDES

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026

Attribution