Show on map
Ray Braswell - Lakeover 500 kV — Transmission lineTraceview Advanced Power Station — Under construction · Gas, combined cycle · MS · 819.4 MW · 0.4 mi awayJACKSON DATA CENTER — Large load · MS · 1.4 mi awayHinds Solar, LLC — Under construction · Solar · MS · 150 MW · 2.3 mi awayAMAZON DATA SERVICES INC, MADISON MEGA SITE — Built · Large load · MS · 12.3 mi away
  • Combustion
  • Wind & solar
  • Loads
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Ray Braswell - Lakeover 500 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
500 kV
States crossed
US-MS
Owner (as stated)
Entergy Mississippi

Details

Who’s behind it

Owner
Entergy Mississippi

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
23
Substations at the ends (as the source names them)
Ray Braswell to Lakeover
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itentergy mississippi
HIFLD line ID105366
Voltage class500 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Traceview Advanced Power Station Under construction Gas, combined cycle 0.4 mi 819.4
JACKSON DATA CENTER Unknown Large load 1.4 mi
Hinds Solar, LLC Under construction Solar 2.3 mi 150
AMAZON DATA SERVICES INC, MADISON MEGA SITE Built Large load 12.3 mi

Sources EIA-860M · EPA ICIS-NPDES · EPA ICIS-Air · Epoch AI

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026
  • Epoch AIOpen license, with credit · retrieved Nov 13, 2026Epoch AI, AI data centers (Frontier Data Centers hub), CC BY 4.0, https://epoch.ai/data/ai-data-centers. Modified by Inframation: selected rows and columns only; figures are Epoch AI's estimates and are shown as such; names and statuses mapped to Inframation's vocabulary.

Attribution