Ray Braswell - Northside Drive 230 kV — Transmission lineTraceview Advanced Power Station — Under construction · Gas, combined cycle · MS · 819.4 MW · 4.7 mi awayJACKSON DATA CENTER — Large load · MS · 5.8 mi awayHinds Solar, LLC — Under construction · Solar · MS · 150 MW · 7.0 mi away
  • Combustion
  • Wind & solar
  • Loads
  • Under construction
  • Stage not stated
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Ray Braswell - Northside Drive 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-MS
Owner (as stated)
Entergy Mississippi

Details

Who’s behind it

Owner
Entergy Mississippi

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
5
Substations at the ends (as the source names them)
Ray Braswell to Northside Drive
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itentergy mississippi
HIFLD line ID126497
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Traceview Advanced Power Station Under construction Gas, combined cycle 4.7 mi 819.4
JACKSON DATA CENTER Unknown Large load 5.8 mi
Hinds Solar, LLC Under construction Solar 7.0 mi 150

Sources EIA-860M · EPA ICIS-NPDES