Show on map
- Combustion
- Storage
- Loads
- In development
- Under construction
- Operating
- Stage not stated
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Storage
- Loads
- In development
- Under construction
- Operating
- Stage not stated
- Size not stated
Ray Olinger: location and 12 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Ray Olinger
Power plant · Gas, steam turbine
Key facts
Power plant · Gas, steam turbineran 1% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1967
- Net generation, 2025
- 51,072 MWh
- Grid
- 138 kV to City of Garland - (TX) (ERCO)
- Location
- Collin County, Texas
- Operated by
- City of Garland - (TX)
Output
- Gas
- Oil
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, steam turbine source: “Natural Gas Steam Turbine”
- Age
- 59 years since 1967
- Unused energy
- 3,696 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 14,531 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 742,136 |
| Capacity factor, 2025 | 0.014 |
| Heat rate (Btu/kWh), 2025 | 14,531.2 |
| Net generation (MWh), 2025 | 51,072 |
| Balancing authority code | ERCO |
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| City of Garland - (TX) | Operator | EIA-860M | ||
| CITY OF GARLAND TEXAS | Owner | 100.0% | 31 Dec 2023 | EPA GHGRP |
Timeline
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Mallard Energy Storage Under construction | Storage | 0.5 km | 250 |
| Boxcar Energy Storage Under construction | Storage | 8.4 km | 150 |
| ROYSE CITY DATA CENTER Under construction | Large load | 16.2 km | |
| Sandman Solar Postponed | Storage | 16.9 km | 100 |
| BANK OF AMERICA - RTX MODULAR DATA CENTER Built | Large load | 20.5 km | |
| FLEXENTIAL DATA CENTER EXPANSION Built | Large load | 21.0 km | |
| SDC DFW-VII DATA CENTER PHASE 2 Built | Large load | 21.0 km | |
| Crane DLR37 (Garland data centre) Filed | Large load | 21.0 km | |
| RAGINGWIRE DATA CENTER Built | Large load | 21.5 km | |
| NTT TX-4 DATA CENTER Under construction | Large load | 21.5 km | |
| EDGECORE DATACENTER - FUJITSU CAMPUS ADDITION Unknown | Large load | 21.6 km | |
| ALIGNED DATA CENTER MEMORY TECH PHASE 1 ADDITION Built | Large load | 21.8 km |
Sources EIA-860M · EPA ICIS-NPDES · FAA OE/AAA