Show on map
RE Dillard 2 LLC — Power plant · Solar · MN8 Energy LLCJuniper Creek Storage — Permitted · Storage · CA · 200 MW · 6.3 mi awaySacramento Valley Energy Center, LLC — Under construction · Solar + storage · CA · 300 MW · 7.3 mi awayDry Creek Energy Storage, LLC — Permitted · Storage · CA · 160 MW · 8.8 mi awayMule Creek State Prison — Postponed · Solar · CA · 2.1 MW · 13.9 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

RE Dillard 2 LLC

Power plant · Solar

Key facts

Power plant · Solarran 23% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2012
Net generation, 2025
5,929 MWh
Grid
69 kV to Sacramento Municipal Util Dist (BANC)
Location
Sacramento County, California
Operated by
MN8 Energy LLC

Output

Net generation MWh by year, 2012 to 2025

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
14 years since 2012
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000817445
Location id
L100000814649
Eia plant ids
57779
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
69
Transmission owner
Sacramento Municipal Util Dist
Balancing authority code
BANC
Balancing authority name
Balancing Authority of Northern California
Fuel burned (MMBtu), 202520,230
Capacity factor, 20250.226
Net generation (MWh), 20255,929
Balancing authority codeBANC

Solar array

Array area (acres)
16.4
AC capacity (MW)
3
DC capacity (MW)
3.8
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2012

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
MN8 Energy LLC Operator EIA-860M
RE Dillard 2 LLC Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory
  • EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Juniper Creek Storage Permitted Storage 6.3 mi 200
Sacramento Valley Energy Center, LLC Under construction Solar + storage 7.3 mi 300
Dry Creek Energy Storage, LLC Permitted Storage 8.8 mi 160
Mule Creek State Prison Postponed Solar 13.9 mi 2.1

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution