Show on map
RE Victor Phelan Solar One LLC — Power plant · Solar · MN8 Energy LLCBaldy Mesa Storage — Under construction · Solar + storage · CA · 100 MW · 6.5 mi away
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

RE Victor Phelan Solar One LLC

Power plant · Solar

Key facts

Power plant · Solarran 26% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2013
Net generation, 2025
45,053 MWh
Grid
33 kV to Southern California Edison Co (CISO)
Location
San Bernardino County, California
Operated by
MN8 Energy LLC

Output

Net generation MWh by year, 2013 to 2025

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
13 years since 2013
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000805183
Location id
L100000804503
Eia plant ids
58202
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
33
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 2025153,720
Capacity factor, 20250.257
Net generation (MWh), 202545,053
Balancing authority codeCISO

Solar arrays

Array area (acres)
111.1
AC capacity (MW)
17.5
DC capacity (MW)
22.3
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2013

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
MN8 Energy LLC Operator EIA-860M
RE Victor Phelan Solar One LLC Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory
  • EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Baldy Mesa Storage Under construction Solar + storage 6.5 mi 100

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 16, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution