Show on map
Reid - Nipetown 138 kV — Transmission lineBedington Energy Facility, LLC — Filed · Solar · WV · 100 MW · 1.6 mi awayESS Wesel — Postponed · Storage · MD · 6 MW · 2.4 mi awayDownsville II — Under construction · Solar · MD · 2 MW · 2.6 mi awayMason Dixon Solar Center — Postponed · Solar · MD · 20 MW · 2.6 mi awayESS Fairgrounds — Postponed · Storage · MD · 4 MW · 2.7 mi awayWVA1 DC1 (Martinsburg data centre) — Filed · Large load · WV · 8.6 mi awayMaple Ridge A — Under construction · Solar · PA · 3 MW · 14.2 mi awayMaple Ridge B — Under construction · Solar · PA · 3 MW · 14.2 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Reid - Nipetown 138 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-MD, US-WV
Owner (as stated)
Potomac Edison

Details

Who’s behind it

Owner
Potomac Edison

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
19
Substations at the ends (as the source names them)
Reid to Nipetown
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itpotomac edison
HIFLD line ID112892
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Bedington Energy Facility, LLC Filed Solar 1.6 mi 100
ESS Wesel Postponed Storage 2.4 mi 6
Downsville II Under construction Solar 2.6 mi 2
Mason Dixon Solar Center Postponed Solar 2.6 mi 20
ESS Fairgrounds Postponed Storage 2.7 mi 4
WVA1 DC1 (Martinsburg data centre) Filed Large load 8.6 mi
Maple Ridge A Under construction Solar 14.2 mi 3
Maple Ridge B Under construction Solar 14.2 mi 3

Sources EIA-860M · FAA OE/AAA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 16, 2026

Attribution