Remington Ct 115 kV line — Transmission lineRemington Technology Park Limited Partnership — Filed · Large load · VA · 0.4 mi awayBealeton Solar — Filed · Solar · VA · 14.2 MW · 0.9 mi awayMarsh Run Generation Facility — Postponed · Gas, combustion turbine · VA · 195.5 MW · 1.0 mi awayAMAZON DCA-50 — Built · Large load · VA · 7.3 mi awayAMAZON DATA SERVICES INC - DCA-060 — Built · Large load · VA · 9.0 mi awayDCA - 21040 Germanna Hwy Stevensburg VA (Culpeper data centre) — Filed · Large load · VA · 9.1 mi awayGreenwood Solar I — Permitted · Solar · VA · 100 MW · 11.0 mi awayAmazon Data Services Inc - DCA-062 — Filed · Large load · VA · 12.7 mi awayEQUINIX, LLC - CU 1-4 — Built · Large load · VA · 12.8 mi awayDATA CENTER VINT HILL LLC — Built · Large load · VA · 13.2 mi awayDataBank Data Center Culpeper LLC — Filed · Large load · VA · 13.4 mi awayReid Energy Center, LLC — Under construction · Storage · VA · 20 MW · 13.5 mi awayAMAZON DATA SERVICES - DCA-51 — Built · Large load · VA · 13.7 mi awayMICROSOFT — Built · Large load · VA · 13.7 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Remington Ct 115 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
115 kV
States crossed
US-VA
Owner (as stated)
Virginia Electric Power

Details

Who’s behind it

Owner
Virginia Electric Power

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
4
Substations at the ends (as the source names them)
Remington Ct
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itvirginia electric power
HIFLD line ID128003
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Remington Technology Park Limited Partnership Filed Large load 0.4 mi
Bealeton Solar Filed Solar 0.9 mi 14.2
Marsh Run Generation Facility Postponed Gas, combustion turbine 1.0 mi 195.5
AMAZON DCA-50 Built Large load 7.3 mi
AMAZON DATA SERVICES INC - DCA-060 Built Large load 9.0 mi
DCA - 21040 Germanna Hwy Stevensburg VA (Culpeper data centre) Filed Large load 9.1 mi
Greenwood Solar I Permitted Solar 11.0 mi 100
Amazon Data Services Inc - DCA-062 Filed Large load 12.7 mi
EQUINIX, LLC - CU 1-4 Built Large load 12.8 mi
DATA CENTER VINT HILL LLC Built Large load 13.2 mi
DataBank Data Center Culpeper LLC Filed Large load 13.4 mi
Reid Energy Center, LLC Under construction Storage 13.5 mi 20
AMAZON DATA SERVICES - DCA-51 Built Large load 13.7 mi
MICROSOFT Built Large load 13.7 mi

Sources Virginia DEQ · EIA-860M · EPA ICIS-Air · FAA OE/AAA

Sources

  • Virginia DEQOpen license · retrieved Nov 4, 2026Source: Virginia Department of Environmental Quality
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026
  • FAA OE/AAAOpen license · retrieved Nov 16, 2026

Attribution