Rhinelander Mill
Power plant · Gas, steam turbine
Key facts
Power plant · Gas, steam turbineran 3% of 2025 Out of service- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1917
- Net generation, 2025
- 5,817 MWh
- Grid
- 115 kV to Wisconsin Public Service Corp (MISO)
- Location
- Oneida County, Wisconsin
- Operated by
- Ahlstrom-Munksjo
Output
- Gas
- Coal
- Oil
- Unspecified fuel
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, steam turbine source: “Natural Gas Steam Turbine”
- Age
- 109 years since 1917
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 2,128,711 |
| Capacity factor, 2025 | 0.031 |
| Net generation (MWh), 2025 | 5,817 |
| Balancing authority code | MISO |
Data notes (1)
- Heat rate (Btu/kWh), 2025 not shown: computed 365946.5 outside 5000-30000 Btu/kWh
Retirement
- Capacity retired
- 4 MW
- Generators retired
- 1
- Capacity still in service
- 21.3 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN3 | Natural Gas Steam Turbine | 4 MW | Retired | December 2012 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 115 kV
- Transmission or distribution system owner
- Wisconsin Public Service Corp
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- MRO
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Ahlstrom-Munksjo | Operator | EIA-860M | ||
| AHLSTROM-MUNKSJO NORTH AMERICA SPECIALTY SOLUTIONS LLC | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- Stated Unit GEN3 scheduled to retire, 4 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)