Power plant · Biomass

Key facts

Power plant · Biomassran 89% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2002
Net generation, 2025
37,298 MWh
Grid
25 kV to Wisconsin Electric Power Co (MISO)
Location
Manitowoc County, Wisconsin

Output

Net generation MWh by year, 2002 to 2025
Fuel burned MMBtu by year, 2002 to 2025
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
24 years since 2002
Heat rate
12,275 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110010410581
Subparts reported
C, HH
NAICS code
562212
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1007834
Fuel burned (MMBtu), 2025457,820
Capacity factor, 20250.887
Heat rate (Btu/kWh), 202512,274.7
Net generation (MWh), 202537,298
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
3.2 MW
Generators retired
4
Capacity still in service
4.8 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN10Landfill Gas0.8 MWRetiredSeptember 2010
GEN9Landfill Gas0.8 MWRetiredJune 2013
GEN3Landfill Gas0.8 MWRetiredNovember 2014
GEN4Landfill Gas0.8 MWRetiredNovember 2014

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
25 kV
Transmission or distribution system owner
Wisconsin Electric Power Co
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Bio-Energy Partners Operator EIA-860M
WASTE MANAGEMENT INC Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Units GEN3, GEN4 scheduled to retire, 1.6 MW · EIA-860M
  • Stated Unit GEN9 scheduled to retire, 0.8 MW · EIA-860M
  • Stated Unit GEN10 scheduled to retire, 0.8 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Manitowoc Postponed Biomass 17.2 km 60
Tisch Mills Wind Postponed Wind 21.6 km 150

Sources EIA-860M