Show on map
Ring Road — Power plant · Solar · Greenbacker Renewable Energy CorporationSolar Carver 3 Hybrid — Solar + storage · MA · 2 MW · 14.9 km awaySolar Carver 1 Hybrid — Solar + storage · MA · 4 MW · 16.9 km awayLogging Swamp North — Solar · MA · 5 MW · 23.8 km awayLogging Swamp South — Solar · MA · 5 MW · 23.8 km awayBraley Hill North Solar — Solar + storage · MA · 10 MW · 24.4 km awaySnipatuit Road Solar — Solar + storage · MA · 8 MW · 24.5 km away
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 6% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Net generation, 2025
1,967 MWh
Grid
23 kV to NSTAR Electric Company (ISNE)
Location
Plymouth County, Massachusetts
Operated by
Greenbacker Renewable Energy CorporationSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
1 year since 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
22.80
Transmission owner
NSTAR Electric Company
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Fuel burned (MMBtu), 20256,711
Capacity factor, 20250.056
Net generation (MWh), 20251,967
Balancing authority codeISNE

Solar arrays

Array area (acres)
7.1
AC capacity (MW)
2
DC capacity (MW)
2
Site type
Greenfield
Began operating
2025

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Solar Carver 3 Hybrid Under construction Solar + storage 14.9 km 2
Solar Carver 1 Hybrid Under construction Solar + storage 16.9 km 4
Logging Swamp North Permitted Solar 23.8 km 5
Logging Swamp South Permitted Solar 23.8 km 5
Braley Hill North Solar Under construction Solar + storage 24.4 km 10
Snipatuit Road Solar Under construction Solar + storage 24.5 km 8

Sources EIA-860M

Sources

Attribution