Show on map
Rio Pinar - Curry Ford 230 kV — Transmission lineVERIZON ORLANDO DATA CENTER — Built · Large load · FL · 4.4 mi awayCurtis H Stanton Energy Center — Postponed · Coal · FL · 329 MW · 5.4 mi awayCORESITE REAL ESTATE OR1 LLC — Built · Large load · FL · 11.6 mi awayCOMCAST DATA CENTER — Built · Large load · FL · 11.7 mi away
  • Loads
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Rio Pinar - Curry Ford 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-FL
Owner (as stated)
Duke Energy Florida

Details

Who’s behind it

Owner
Duke Energy Florida

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
3
Substations at the ends (as the source names them)
Rio Pinar to Curry Ford
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itduke energy florida
HIFLD line ID107523
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
VERIZON ORLANDO DATA CENTER Built Large load 4.4 mi
Curtis H Stanton Energy Center Postponed Coal 5.4 mi 329
CORESITE REAL ESTATE OR1 LLC Built Large load 11.6 mi
COMCAST DATA CENTER Built Large load 11.7 mi

Sources EPA ICIS-NPDES · EIA-860M · EPA ICIS-Air

Sources

Attribution