Show on map
Ripp Switching Station 230 kV line — Transmission lineCleveland Cnty Generating Facility — Postponed · Gas, combustion turbine · NC · 736 MW · 0.3 mi awayBELLSOUTH TELECOMMUNICATIONS, LLC DBA AT&T NORTH CAROLINA — Built · Large load · NC · 3.9 mi awayHigh Pockets Solar — Postponed · Solar · NC · 1.9 MW · 9.4 mi awayBradley Farm — Postponed · Solar · NC · 5 MW · 14.6 mi away
  • Loads
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Ripp Switching Station 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NC, US-SC
Owner (as stated)
Duke Energy Carolinas

Details

Who’s behind it

Owner
Duke Energy Carolinas

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
5
Substations at the ends (as the source names them)
Ripp Switching Station
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itduke energy carolinas
HIFLD line ID180139
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Cleveland Cnty Generating Facility Postponed Gas, combustion turbine 0.3 mi 736
BELLSOUTH TELECOMMUNICATIONS, LLC DBA AT&T NORTH CAROLINA Built Large load 3.9 mi
High Pockets Solar Postponed Solar 9.4 mi 1.9
Bradley Farm Postponed Solar 14.6 mi 5

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution