Show on map
Riverside (MD) — Power plant · Gas, combustion turbine · Constellation Power Source Generation, LLCMarley Neck 3 - SLBAL005 — Solar · MD · 2 MW · 5.8 km awayMarley Neck 4 - SLBAL006 — Solar · MD · 1.4 MW · 5.8 km awayAMAZON DATA SERVICES INC LTW062 — Large load · MD · 17.9 km awayCONTROL DATA CORP. — Large load · MD · 21.6 km awayAMAZON DATA SERVICES INC LTW060 — Large load · MD · 24.0 km away
  • Combustion
  • Wind & solar
  • Loads
  • Under construction
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Riverside (MD)

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 0% of 2019 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1951
Net generation, 2019
276 MWh
Grid
115 kV to Baltimore Gas & Electric Co (PJM)
Location
Baltimore County, Maryland

Output

Net generation MWh by year, 2001 to 2019
Fuel burned MMBtu by year, 2001 to 2019
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Owner
Exelon

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
75 years since 1951
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110071161628
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000645
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2019
First unit retired
June 2014
Capacity retired
257.2 MW
Generators retired
4
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GT6Natural Gas Fired Combustion Turbine135 MWRetiredJune 2014
4Natural Gas Steam Turbine72.2 MWRetiredMay 2016
GT7Petroleum Liquids25 MWRetiredMarch 2019
GT8Petroleum Liquids25 MWRetiredDecember 2019
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Fired Combustion Turbine135 MW
Natural Gas Steam Turbine72.2 MW
Petroleum Liquids50 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
115 kV
Transmission or distribution system owner
Baltimore Gas & Electric Co
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Constellation Power Source Generation, LLC Operator EIA-860M
Exelon Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Unit GT8 scheduled to retire, 25 MW · EIA-860M
  • Stated Unit GT7 scheduled to retire, 25 MW · EIA-860M
  • Stated Unit 4 scheduled to retire, 72.2 MW · EIA-860M
  • Stated Unit GT6 scheduled to retire, 135 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Marley Neck 3 - SLBAL005 Under construction Solar 5.8 km 2
Marley Neck 4 - SLBAL006 Under construction Solar 5.8 km 1.4
AMAZON DATA SERVICES INC LTW062 Built Large load 17.9 km
CONTROL DATA CORP. Built Large load 21.6 km
AMAZON DATA SERVICES INC LTW060 Built Large load 24.0 km