Show on map
Riverside (OK) — Power plant · Gas, steam turbine · Public Service Co of OklahomaBP AMOCO / 512 S CINCINNATI AVE SHARED SERVICE CE — Built · Large load · OK · 10.8 mi away
  • Combustion
  • Loads
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Riverside (OK)

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 8% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1974
Net generation, 2025
745,862 MWh
Grid
345 kV to Public Service Co of Oklahoma (SWPP)
Location
Tulsa County, Oklahoma

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
52 years since 1974
Unused energy
9,080 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
11,808 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
MRO
Report year
2025
Grid voltage kv
345
Transmission owner
Public Service Co of Oklahoma
Balancing authority code
SWPP
Balancing authority name
Southwest Power Pool
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110071160512
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000998
Fuel burned (MMBtu), 20258,807,437
Capacity factor, 20250.076
Heat rate (Btu/kWh), 202511,808.4
Net generation (MWh), 2025745,862
Balancing authority codeSWPP

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Public Service Co of Oklahoma Operator EIA-860M
AMERICAN ELECTRIC POWER CO INC Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
BP AMOCO / 512 S CINCINNATI AVE SHARED SERVICE CE Built Large load 10.8 mi

Sources EPA ICIS-Air

Sources

Attribution