Riviera — Power plant · Gas, combined cycle · Florida Power & Light CoATT 911 Backbone (West Palm Beach data centre) — Large load · FL · 9.8 km away
  • Combustion
  • Loads
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 61% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2014
Net generation, 2025
6,929,389 MWh
Grid
230 kV to Florida Power & Light Co (FPL)
Location
Palm Beach County, Florida

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
12 years since 2014
Unused energy
4,415 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
6,560 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
NextEra Energy Inc
Share pct
100
Gem entity id
E100000001267
Unit ids
G100000402117
Location id
L100000401954
Eia plant ids
5, 619
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000363963
Subparts reported
D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001485
Fuel burned (MMBtu), 202545,459,345
Capacity factor, 20250.611
Heat rate (Btu/kWh), 20256,560.4
Net generation (MWh), 20256,929,389.1
Balancing authority codeFPL

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
620.8 MW
Generators retired
2
Capacity still in service
1,295 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
3Petroleum Liquids310.4 MWRetiredFebruary 2011
4Petroleum Liquids310.4 MWRetiredFebruary 2011

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
230 kV
Transmission or distribution system owner
Florida Power & Light Co
Balancing authority
Florida Power & Light Company
NERC region
SERC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Florida Power & Light Co Operator EIA-860M
NextEra Energy Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • In service · EIA-860M
  • Stated Units 3, 4 scheduled to retire, 620.8 MW · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
ATT 911 Backbone (West Palm Beach data centre) Built Large load 9.8 km