Roadrunner
Gas pipeline · intrastate
Key facts
Gas pipeline · intrastate Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- Class
- intrastate
- States crossed
- US-TX
- Operated by
- RoadrunnerSourceEIA US Energy Atlas — Natural Gas Interstate and Intrastate Pipelines (line geometries)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Pipeline class
- intrastate
- Mapped route length (miles)
- 198
- Technology
- Intrastate source: “Intrastate”
- Units
- 1
All 4 attributes from EIA US Energy Atlas — Natural Gas Interstate and Intrastate Pipelines (line geometries)
| Attribute | Value |
|---|---|
| Mapped parts | 1 |
| Status, as the source states it | Operating |
| Mapped segments | 1 |
| Source release | 202001 |
Sources
2 sourcesAround this pipeline
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Coyanosa Gas Under construction | Gas, reciprocating engine | 2.6 km | 10 |
| Saddleback BESS2 Under construction | Other | 2.7 km | 9.9 |
| Chiltepin Solar Postponed | Solar | 5.2 km | 100 |
| Coyote Springs (TX) Permitted | Oil | 6.1 km | 9.9 |
| Evlou Solar, LLC Under construction | Solar + storage | 10.7 km | 500 |
| OPPIDAN EL PASO DATA CENTER Built | Large load | 15.5 km | |
| Staghorn Gas Under construction | Gas, reciprocating engine | 17.6 km | 9.9 |
| NSCALE DATA CENTER - WARD COUNTY Under construction | Large load | 17.8 km | |
| CPV Basin Ranch Energy Center Under construction | Gas, combined cycle | 21.5 km | 1,350 |