Show on map
Robert D Willis — Power plant · Hydro · USACE-Fort Worth District
  • Clean firm
  • Operating
  • 10 · 100 · 1,000 MW

Robert D Willis

Power plant · Hydro

Key facts

Power plant · Hydro Out of service
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1989
Net generation, 2025
-278 MWh
Grid
25 kV to Jasper-Newton Elec Coop, Inc (MISO)
Location
Jasper County, Texas
Operated by
USACE-Fort Worth DistrictSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2002 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
37 years since 1989
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
25
Transmission owner
Jasper-Newton Elec Coop, Inc
Balancing authority code
MISO
Balancing authority name
Midcontinent Independent Transmission System Operator, Inc..
Eia status
By code
OS
Mw
8
Units
2
Standby mw
0
Status rule
majority_mw_out_of_service
In service mw
8
Out of service mw
8
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-278
Balancing authority codeMISO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -278.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source