Robert D Willis
Power plant · Hydro
Key facts
Power plant · Hydro Out of service- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1989
- Net generation, 2025
- -278 MWh
- Grid
- 25 kV to Jasper-Newton Elec Coop, Inc (MISO)
- Location
- Jasper County, Texas
- Operated by
- USACE-Fort Worth DistrictSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Hydro source: “Conventional Hydroelectric”
- Age
- 37 years since 1989
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | -278 |
| Balancing authority code | MISO |
Data notes (1)
- Capacity factor, 2025 not shown: net generation -278.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory