Show on map
Rock Tavern - Ramapo 345 kV — Transmission lineTBE-Montgomery LLC — Under construction · Biomass · NY · 21 MW · 2.1 mi awayNYSE DATA CENTER CRANE — Filed · Large load · NJ · 4.5 mi awayNY2 Battery — Filed · Storage · NY · 151.5 MW · 4.9 mi awayNL NY- Pulaski — Under construction · Solar + storage · NY · 5 MW · 7.8 mi awayBowline Point — Postponed · Gas, combined cycle · NY · 750 MW · 10.4 mi awayORANGETOWN DATA CENTER — Built · Large load · NY · 11.7 mi awayDATA CENTER BUILDING EXPANSION — Under construction · Large load · NY · 12.3 mi away
  • Wind & solar
  • Storage
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Rock Tavern - Ramapo 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-NY
Owner (as stated)
Central Hudson Gas Electric

Details

Who’s behind it

Owner
Central Hudson Gas Electric

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
28
Substations at the ends (as the source names them)
Rock Tavern to Ramapo
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itcentral hudson gas electric
HIFLD line ID157071
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
TBE-Montgomery LLC Under construction Biomass 2.1 mi 21
NYSE DATA CENTER CRANE Filed Large load 4.5 mi
NY2 Battery Filed Storage 4.9 mi 151.5
NL NY- Pulaski Under construction Solar + storage 7.8 mi 5
Bowline Point Postponed Gas, combined cycle 10.4 mi 750
ORANGETOWN DATA CENTER Built Large load 11.7 mi
DATA CENTER BUILDING EXPANSION Under construction Large load 12.3 mi

Sources EIA-860M · FAA OE/AAA · EPA ICIS-Air · EPA ICIS-NPDES

Sources