Show on map
Rokeby — Power plant · Gas, combustion turbine · Lincoln Electric SystemPrinceton Road Station — Announced · Gas, combustion turbine · NE · 748 MW · 11.4 mi awayData Center — Filed · Large load · NE · 12.5 mi awayTerry Bundy Generating Station — Filed · Gas, combustion turbine · NE · 104 MW · 13.9 mi away
  • Combustion
  • Loads
  • In development
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 1% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1975
Net generation, 2025
13,281 MWh
Grid
115 kV to Lincoln Electric System (SWPP)
Location
Lancaster County, Nebraska
Operated by
Lincoln Electric SystemSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Owner
Lincoln Electric SystemSource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
51 years since 1975
Unused energy
2,318 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
20,786 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
MRO
Report year
2025
Grid voltage kv
115
Transmission owner
Lincoln Electric System
Balancing authority code
SWPP
Balancing authority name
Southwest Power Pool
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000565816
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001054
Fuel burned (MMBtu), 2025276,052
Capacity factor, 20250.006
Heat rate (Btu/kWh), 202520,785.5
Net generation (MWh), 202513,281
Balancing authority codeSWPP

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Princeton Road Station Announced Gas, combustion turbine 11.4 mi 748
Data Center Filed Large load 12.5 mi
Terry Bundy Generating Station Filed Gas, combustion turbine 13.9 mi 104

Sources EIA-860M · FAA OE/AAA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 13, 2026

Attribution