Roundhouse Renewable Energy II
Power plant · Wind
Key facts
Power plant · Windran 41% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2023
- Net generation, 2025
- 376,380 MWh
- Grid
- 115 kV to Cheyenne Light Fuel & Power (WACM)
- Location
- Laramie County, Wyoming
- Operated by
- Roundhouse Renewable Energy II, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 376,380
MWh - Fuel burned, 2025
- 1,284,209
MMBtu - Capacity factor, 2025
- 40.6
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2026 (8 of 12 months) | 269,178 | 918,436 | — | — |
| 2025 | 376,380 | 1,284,209 | 40.6% | — |
| 2024 | 393,578 | 1,342,888 | 42.4% | — |
| 2023 (1 of 12 months) | 6 | 20 | — | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.