Show on map
Roundhouse Renewable Energy II — Power plant · Wind · Roundhouse Renewable Energy II, LLCCYS42 DATA CENTER PROJECT (MICROSOFT) — Large load · WY · 6.7 mi awayMICROSOFT CHEYENNE DATA CENTER (MICROSOFT CORPORATION) — Built · Large load · WY · 7.1 mi awayCheyenne Data Center - Tembo — Filed · Large load · WY · 9.0 mi awayCYS19 DATA CENTER — Large load · WY · 10.8 mi awayRawhide — Announced · Gas, combustion turbine · CO · 223 MW · 13.5 mi away110T Crawler (Cheyenne data centre) — Filed · Large load · WY · 14.1 mi awayCYS43 DATA CENTER — Large load · WY · 14.5 mi away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Roundhouse Renewable Energy II

Power plant · Wind

Key facts

Power plant · Windran 41% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2023
Net generation, 2025
376,380 MWh
Grid
115 kV to Cheyenne Light Fuel & Power (WACM)
Location
Laramie County, Wyoming
Operated by
Roundhouse Renewable Energy II, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2023 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
3 years since 2023
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
115
Transmission owner
Cheyenne Light Fuel & Power
Balancing authority code
WACM
Balancing authority name
Western Area Power Administration - Rocky Mountain Region
Fuel burned (MMBtu), 20251,284,209
Capacity factor, 20250.406
Net generation (MWh), 2025376,380
Balancing authority codeWACM

Wind turbines

Turbines
38
Turbine capacity (MW)
87.4
Turbine models
38 GE Wind GE2.3-116
Hub height (m)
94
Rotor diameter (m)
116
Year online
2023

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CYS42 DATA CENTER PROJECT (MICROSOFT) Unknown Large load 6.7 mi
MICROSOFT CHEYENNE DATA CENTER (MICROSOFT CORPORATION) Built Large load 7.1 mi
Cheyenne Data Center - Tembo Filed Large load 9.0 mi
CYS19 DATA CENTER Unknown Large load 10.8 mi
Rawhide Announced Gas, combustion turbine 13.5 mi 223
110T Crawler (Cheyenne data centre) Filed Large load 14.1 mi
CYS43 DATA CENTER Unknown Large load 14.5 mi

Sources EPA ICIS-NPDES · EPA ICIS-Air · FAA OE/AAA · EIA-860M

Sources

Attribution