Rupert Cogen Project
Power plant · Gas, combined cycle
Key facts
Power plant · Gas, combined cycleran 72% of 2016 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1996
- Net generation, 2016
- 65,841 MWh
- Location
- Minidoka County, Idaho
- Operated by
- Energy Operations Group, LLC
Output
- Gas
Details
Who’s behind it
- Owner
- Rupert Holdings, LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
- Age
- 30 years since 1996
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Balancing authority code | BPAT |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- November 2016
- Capacity retired
- 10.4 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1002 | Natural Gas Fired Combined Cycle | 10.4 MW | Retired | November 2016 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- BPAT
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Energy Operations Group, LLC | Operator | EIA-860M | ||
| Rupert Holdings, LLC | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- Stated Unit 1002 scheduled to retire, 10.4 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Conner Ridge Postponed | Wind | 7.6 mi | 19.5 |
| Chapin Mountain Postponed | Wind | 8.7 mi | 19.5 |
| Bonanza Bar Postponed | Wind | 11.1 mi | 20 |
Sources EIA-860M