Russell Energy Center: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Russell Energy Center
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbineran 0% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2002
- Net generation, 2025
- 385 MWh
- Grid
- 34 kV to Sunflower Electric Power Corp (SWPP)
- Location
- Russell County, Kansas
- Operated by
- City of Russell - (KS)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 385
MWh - Fuel burned, 2025
- 4,651
MMBtu - Capacity factor, 2025
- 0.3
% - Heat rate, 2025
- 12,080
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 385 | 4,651 | 0.3% | 12,080 |
| 2024 | 700 | 8,006 | 0.5% | 11,437 |
| 2023 | 2,380 | 31,252 | 1.8% | 13,131 |
| 2022 | 2,330 | 30,490 | 1.8% | 13,086 |
| 2021 | 576 | 7,043 | 0.4% | 12,227 |
| 2020 | 543 | 6,417 | 0.4% | 11,818 |
| 2019 | 1,229 | 14,718 | 0.9% | 11,976 |
| 2018 | 1,212 | 14,567 | 0.9% | 12,019 |
| 2017 | 187 | 2,331 | 0.1% | 12,465 |
| 2016 | 1,800 | 20,359 | 1.4% | 11,311 |
| 2015 | 17 | 286 | 0.0% | 16,824 |
| 2014 | 2,088 | 23,429 | 1.6% | 11,221 |
| 2013 | 7,085 | 82,256 | 5.4% | 11,610 |
| 2012 | 22,198 | 260,856 | 16.9% | 11,751 |
| 2011 | 2,037 | 23,903 | 1.6% | 11,734 |
| 2010 | 3,710 | 48,649 | 2.8% | 13,113 |
| 2009 | 7,048 | 91,249 | 5.4% | 12,947 |
| 2008 | 6,864 | 88,532 | 5.2% | 12,898 |
| 2007 | 17,842 | 18,688 | 13.6% | — |
| 2006 | 33,694 | 403,441 | 25.6% | 11,974 |
| 2005 | 62,798 | 750,865 | 47.8% | 11,957 |
| 2004 | 58,017 | 697,543 | 44.0% | 12,023 |
| 2003 | 19,122 | 200,121 | 14.5% | 10,465 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.