Show on map
Sabine — Power plant · Gas, steam turbine · Entergy Texas Inc.Orange County Advanced Power Station — Under construction · Gas, combined cycle · TX · 1,306 MW · 0.7 km awayLegend Power Station — Studied · Gas, other · TX · 820 MW · 19.6 km away
  • Combustion
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 27% of 2024 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1962
Net generation, 2024
4,221,911 MWh
Grid
138 kV to Entergy Texas Inc. (MISO)
Location
Orange County, Texas

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
64 years since 1962
Heat rate
12,468 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110071161574
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1006721
Fuel burned (MMBtu), 202543,402,881
Capacity factor, 20250.219
Heat rate (Btu/kWh), 202512,467.7
Net generation (MWh), 20253,481,227.0
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Capacity retired
239.4 MW
Generators retired
1
Next scheduled retirement
October 2026
Capacity scheduled to retire
1,304.4 MW
Generators scheduled to retire
3
Share of in-service capacity scheduled
72%
Capacity still in service
1,811.8 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
2Natural Gas Steam Turbine239.4 MWRetiredOctober 2016
1Natural Gas Steam Turbine239.4 MWScheduled to retireOctober 2026
3Natural Gas Steam Turbine473.4 MWScheduled to retireOctober 2026
4Natural Gas Steam Turbine591.6 MWScheduled to retireOctober 2026
Retirement changes (1)
  • Planned retirement date moved seen 2026-10-24 1,304.4 MW unit 1 (Natural Gas Steam Turbine, 239.4 MW): September 2026 to October 2026; unit 3 (Natural Gas Steam Turbine, 473.4 MW): September 2026 to October 2026; unit 4 (Natural Gas Steam Turbine, 591.6 MW): September 2026 to October 2026

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
138 kV
Transmission or distribution system owner
Entergy Texas Inc.
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
SERC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Entergy Texas Inc. Operator EIA-860M
Entergy Corp Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Planned retirement date moved · EIA-860M
  • Stated Units 1, 3, 4 scheduled to retire, 1,304.4 MW · EIA-860M
  • Stated Unit 2 scheduled to retire, 239.4 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · OpenStreetMap · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

© OpenStreetMap contributors

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Orange County Advanced Power Station Under construction Gas, combined cycle 0.7 km 1,306
Legend Power Station Studied Gas, other 19.6 km 820

Sources EIA-860M · Berkeley Lab

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.