Saint Francis Hospital
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engine Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1990
- Location
- Cook County, Illinois
- Operated by
- St Francis HospitalSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
- Age
- 36 years since 1990
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | PJM |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- June 2022
- Capacity retired
- 1.6 MW
- Generators retired
- 2
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN1 | Natural Gas Internal Combustion Engine | 0.8 MW | Retired | June 2022 |
| GEN2 | Natural Gas Internal Combustion Engine | 0.8 MW | Retired | June 2022 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- PJM
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units GEN1, GEN2 scheduled to retire, 1.6 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · LBNL · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Melrose Park 2-SLCHI547 Under construction | Solar | 9.6 mi | 3 |
| Franklin Park 2-SLCHI802 Under construction | Solar | 10.5 mi | 1.2 |
| W Belmont Ave Under construction | Solar | 10.5 mi | 1.4 |
| LEGACY GI 400 LASALLE LLC Unknown | Large load | 10.6 mi | |
| DIGITAL REALTY TRUST LP Built | Large load | 10.7 mi | |
| TIERPOINT ILLINOIS LLC Built | Large load | 10.8 mi | |
| DLR 9311 (Franklin Park data centre) Filed | Large load | 11.1 mi | |
| FRANKLIN PARK (CHI22) DATA CENTER Built | Large load | 11.2 mi | |
| DIGITAL GRAND AVENUE 3 LLC Built | Large load | 11.4 mi | |
| Cicero 3-SLCHI603 Under construction | Solar | 11.6 mi | 1.9 |
| Des Plaines 11-SLCHI211 Under construction | Solar | 11.8 mi | 1.6 |
| EQUINIX LLC Built | Large load | 12.3 mi | |
| QUALITY TECHNOLOGY SERVICES LLC Built | Large load | 12.5 mi | |
| HYDRAVAULT LLC Built | Large load | 12.7 mi | |
| Copenhagen Ct Under construction | Solar | 13.3 mi | 3.5 |
| T5 Data Center Northlake Filed | Large load | 13.4 mi | |
| T5@CHICAGO III LP Built | Large load | 13.4 mi | |
| ITT Cogen Facility Under construction | Gas, reciprocating engine | 13.4 mi | 8.2 |
| Northlake 5-SLCHI305 Under construction | Solar | 13.6 mi | 2.5 |
| Bensenville Ind Park 11 Under construction | Solar | 13.6 mi | 1.2 |
| Northlake 3-SLCHI303 Under construction | Solar | 13.7 mi | 1.6 |
| EDGECONNEX × 2 units Unknown | Large load | 13.7 mi | |
| Bensenville Ind Park 10-SLCHI410 Under construction | Solar | 13.7 mi | 1.2 |
| Cloud HQ- ORD Filed | Large load | 13.7 mi | |
| Bensenville 14-SLCHI414 Under construction | Solar | 13.7 mi | 1.3 |
| NALCO WATER Built | Large load | 13.7 mi | |
| STREAM DATA CENTERS Built | Large load | 13.8 mi | |
| MICROSOFT CORP-CHICAGO DATA CENTER Built | Large load | 13.8 mi | |
| Bensenville Ind Park 6-SLCHI406 Postponed | Solar | 13.8 mi | 1.1 |
| Bensenville Ind Park 12-SLCHI412 Postponed | Solar | 13.8 mi | 1.1 |
| STREAM DATA CENTERS ORDC CAMPUS Built | Large load | 13.8 mi | |
| Northlake 4-SLCHI304 Under construction | Solar | 13.8 mi | 1.4 |
| Equinix CH5 Chiller Built | Large load | 13.8 mi | |
| Northlake 2-SLCHI302 Under construction | Solar | 13.9 mi | 1.6 |
| TUR VENTURES LLC Built | Large load | 13.9 mi | |
| EQUINIX CH-5 DATA CENTER Built | Large load | 13.9 mi | |
| Bensenville 13-SLCHI513 Under construction | Solar | 14.0 mi | 1.4 |
| Bensenville Ind Park 4-SLCHI424 Under construction | Solar | 14.0 mi | 1.7 |
| Data Center 901 Busse Road Elk Grove Filed | Large load | 14.0 mi | |
| Elk Grove 1-SLCHI701 Under construction | Solar | 14.1 mi | 1.7 |
| Bensenville Ind Park 2-SLCHI402 Under construction | Solar | 14.1 mi | 1.1 |
| Elk Grove 51-SLCHI151 Under construction | Solar | 14.1 mi | 1.4 |
| Prime Data Center Built | Large load | 14.2 mi | |
| Mobile Crane - Unit (Chicago data centre) Filed | Large load | 14.2 mi | |
| Aligned (Northlake data centre) Built | Large load | 14.3 mi | |
| 2425 BUSSE ROAD LLC Built | Large load | 14.3 mi | |
| CLOUD HQ DATA CENTER Built | Large load | 14.3 mi | |
| Bensenville 2-SLCHI526 Under construction | Solar | 14.3 mi | 1.9 |
| ELK GROVE VILLAGE (CH1-CH2-CH3) DATA CENTER Built | Large load | 14.4 mi |
Sources EIA-860M · EPA ICIS-Air · FAA OE/AAA · EPA ICIS-NPDES