- Combustion
- Retired
- 10 · 100 · 1,000 MW
Map
- Combustion
- Retired
San Angelo: location and 3 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
San Angelo
Power plant · Gas, combined cycle
Key facts
Power plant · Gas, combined cycleran 26% of 2004 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1965
- Net generation, 2004
- 292,833 MWh
- Location
- Tom Green County, Texas
- Operated by
- AEP Texas North CompanySourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
- Age
- 61 years since 1965
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- October 2004
- First unit retired
- September 2004
- Capacity retired
- 126 MW
- Generators retired
- 2
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Natural Gas Fired Combined Cycle | 25 MW | Retired | September 2004 |
| 2 | Natural Gas Fired Combined Cycle | 101 MW | Retired | October 2004 |
Grid
Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.Transmission lines within 15 mi (10)
- 69 kV line (OSM way 345830264)
- 69 kV line (OSM way 345830243)
- 138 kV line (OSM way 192540824)
- 138 kV line (OSM way 192540830)
- 138 kV line (OSM way 345830260)
- 138 kV line (OSM way 345830278)
- 138 kV line (OSM way 345830252)
- 69 kV line (OSM way 192531354)
- 138 kV line (OSM way 192531355)
- 138 kV line (OSM way 192540822)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 2 scheduled to retire, 101 MW · EIA-860M
- Stated Unit 1 scheduled to retire, 25 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · OpenStreetMap · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
© OpenStreetMap contributors
Sources
- EIA-860M
- OpenStreetMap© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Knickerbocker Solar LLC Postponed | Solar | 11.8 mi | 200 |
| RE Bravepost LLC Postponed | Solar | 13.3 mi | 200 |
| Brushy Creek Solar LLC Postponed | Solar | 13.9 mi | 177 |
Sources EIA-860M