San Angelo — Power plant · Gas, combined cycle · AEP Texas North CompanyKnickerbocker Solar LLC — Postponed · Solar · TX · 200 MW · 11.8 mi awayRE Bravepost LLC — Postponed · Solar · TX · 200 MW · 13.3 mi awayBrushy Creek Solar LLC — Postponed · Solar · TX · 177 MW · 13.9 mi away
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 26% of 2004 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1965
Net generation, 2004
292,833 MWh
Location
Tom Green County, Texas
Operated by
AEP Texas North CompanySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2004
Fuel burned MMBtu by year, 2001 to 2004
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
61 years since 1965

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
October 2004
First unit retired
September 2004
Capacity retired
126 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Natural Gas Fired Combined Cycle25 MWRetiredSeptember 2004
2Natural Gas Fired Combined Cycle101 MWRetiredOctober 2004

Grid

Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 2 scheduled to retire, 101 MW · EIA-860M
  • Stated Unit 1 scheduled to retire, 25 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · OpenStreetMap · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

© OpenStreetMap contributors

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Knickerbocker Solar LLC Postponed Solar 11.8 mi 200
RE Bravepost LLC Postponed Solar 13.3 mi 200
Brushy Creek Solar LLC Postponed Solar 13.9 mi 177

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026