Show on map
San Carlos - Gateway 230 kV — Transmission lineData Center — Filed · Large load · FL · 5.7 mi awayLEE HEALTH LAB & DATA CENTER — Under construction · Large load · FL · 5.8 mi awayTELCOFACILITIES DATA CENTER — Under construction · Large load · FL · 11.2 mi away
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

San Carlos - Gateway 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-FL
Owner (as stated)
Florida Power Light

Details

Who’s behind it

Owner
Florida Power Light

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
16
Substations at the ends (as the source names them)
San Carlos to Gateway
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itflorida power light
HIFLD line ID125576
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Data Center Filed Large load 5.7 mi
LEE HEALTH LAB & DATA CENTER Under construction Large load 5.8 mi
TELCOFACILITIES DATA CENTER Under construction Large load 11.2 mi

Sources FAA OE/AAA · EPA ICIS-NPDES

Sources

Attribution