Show on map
San Gorgonio Windplant WPP1993 — Power plant · Wind · FPL Energy Operating Services, Inc.Painted Hills IV Wind — Withdrawn · Wind · CA · 19.5 MW · 2.5 mi awayPainted Hills — Postponed · Wind · CA · 17.5 MW · 2.6 mi awaySolar Photovoltaic Project #45 — Postponed · Solar · CA · 6 MW · 3.5 mi awayWestwind Trust — Postponed · Wind · CA · 15.6 MW · 4.1 mi awayAlta Mesa Project Phase IV — Postponed · Wind · CA · 40 MW · 5.5 mi away
  • Wind & solar
  • Operating
  • 10 · 100 · 1,000 MW

San Gorgonio Windplant WPP1993

Power plant · Wind

Key facts

Power plant · Windran 44% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2011
Net generation, 2025
191,920 MWh
Grid
12 kV to Southern California Edison Co (CISO)
Location
Riverside County, California
Operated by
FPL Energy Operating Services, Inc.SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
15 years since 2011
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000908880, G100000908988
Location id
L100000906583
Eia plant ids
54454
Fuel burned (MMBtu), 2025654,831
Capacity factor, 20250.443
Net generation (MWh), 2025191,920
Balancing authority codeCISO

Wind turbines

Turbines
33
Turbine capacity (MW)
49.5
Turbine models
33 GE Wind GE1.5-77
Hub height (m)
65
Rotor diameter (m)
77
Year online
2011

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
34.5 MW
Generators retired
1
Capacity still in service
49.5 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN3Onshore Wind Turbine34.5 MWRetiredSeptember 2011

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
12 kV
Transmission or distribution system owner
Southern California Edison Co
Balancing authority
California Independent System Operator
NERC region
WECC
Transmission lines within 15 mi (10)
Connection points within 15 mi (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit GEN3 scheduled to retire, 34.5 MW · EIA-860M
  • In service · EIA-860M

Sources

7 sources

Sources EIA-860M · GEM · LBNL · CAISO · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • CAISOOpen license, with credit · retrieved Nov 19, 2026Source: California ISO
  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Painted Hills IV Wind Withdrawn Wind 2.5 mi 19.5
Painted Hills Postponed Wind 2.6 mi 17.5
Solar Photovoltaic Project #45 Postponed Solar 3.5 mi 6
Westwind Trust Postponed Wind 4.1 mi 15.6
Alta Mesa Project Phase IV Postponed Wind 5.5 mi 40

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 19, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution