Show on map
San Mateo - Ravenswood 115 kV — Transmission lineSan Francisco Intl Airport Ct Project — Postponed · Gas, combustion turbine · CA · 48 MW · 5.0 mi awayGateway#1&2 (Newark CA) — Announced · Solar · CA · 1.1 MW · 5.3 mi away7999 Gateway Solar — Under construction · Solar · CA · 4.6 MW · 5.7 mi awayAmeresco Ox Mountain — Filed · Biomass · CA · 3 MW · 7.3 mi awayWaste Management Tri-Cities LFGTE — Postponed · Biomass · CA · 4.8 MW · 8.4 mi awayHAYWARD DATA CENTER — Large load · CA · 8.6 mi away888 Ross Data Center — Filed · Large load · CA · 8.6 mi awayFremont CA AutoFactory — Under construction · Solar · CA · 3.8 MW · 10.6 mi awaySan Leandro 10 - sleba702 — Under construction · Solar · CA · 1 MW · 11.4 mi awayEDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT — Large load · CA · 12.1 mi awayEdgecore -3580 — Filed · Large load · CA · 12.1 mi awaySV8 DATA CENTER — Large load · CA · 12.1 mi awayVANTAGE DATA CENTERS MANAGEMENT CO , LLC — Large load · CA · 12.3 mi awaySJC02 & SJC03 DATA CENTER — Large load · CA · 12.6 mi awayPRIME DATA CENTERS — Built · Large load · CA · 13.0 mi awayKifer BESS 1 — Under construction · Storage · CA · 50 MW · 13.0 mi away4054 Digital Realty — Built · Large load · CA · 13.2 mi away1200 Memorex Skybox Data Center — Filed · Large load · CA · 13.3 mi awayLBA Data Center West — Filed · Large load · CA · 13.5 mi awaySKYBOX DATA CENTER — Built · Large load · CA · 13.6 mi awaySan Francisco Electric Reliability Proj — Withdrawn · Gas, combustion turbine · CA · 151.5 MW · 14.2 mi awayDynegy Oakland Power Plant — Announced · Storage · CA · 43.3 MW · 14.7 mi away
  • Wind & solar
  • Storage
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

San Mateo - Ravenswood 115 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
115 kV
States crossed
US-CA

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
12
Substations at the ends (as the source names them)
San Mateo to Ravenswood
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID309116
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
San Francisco Intl Airport Ct Project Postponed Gas, combustion turbine 5.0 mi 48
Gateway#1&2 (Newark CA) Announced Solar 5.3 mi 1.1
7999 Gateway Solar Under construction Solar 5.7 mi 4.6
Ameresco Ox Mountain Filed Biomass 7.3 mi 3
Waste Management Tri-Cities LFGTE Postponed Biomass 8.4 mi 4.8
HAYWARD DATA CENTER Unknown Large load 8.6 mi
888 Ross Data Center Filed Large load 8.6 mi
Fremont CA AutoFactory Under construction Solar 10.6 mi 3.8
San Leandro 10 - sleba702 Under construction Solar 11.4 mi 1
EDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT Unknown Large load 12.1 mi
Edgecore -3580 Filed Large load 12.1 mi
SV8 DATA CENTER Unknown Large load 12.1 mi
VANTAGE DATA CENTERS MANAGEMENT CO , LLC Unknown Large load 12.3 mi
SJC02 & SJC03 DATA CENTER Unknown Large load 12.6 mi
PRIME DATA CENTERS Built Large load 13.0 mi
Kifer BESS 1 Under construction Storage 13.0 mi 50
4054 Digital Realty Built Large load 13.2 mi
1200 Memorex Skybox Data Center Filed Large load 13.3 mi
LBA Data Center West Filed Large load 13.5 mi
SKYBOX DATA CENTER Built Large load 13.6 mi
San Francisco Electric Reliability Proj Withdrawn Gas, combustion turbine 14.2 mi 151.5
Dynegy Oakland Power Plant Announced Storage 14.7 mi 43.3

Sources EIA-860M · EPA ICIS-NPDES · FAA OE/AAA · EPA ICIS-Air · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • FAA OE/AAAOpen license · retrieved Nov 23, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026
  • CAISOOpen license, with credit · retrieved Nov 25, 2026Source: California ISO

Attribution