Waste Management Tri-Cities LFGTE: the source's site coordinate and 18 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Waste Management Tri-Cities LFGTE
Biomass
- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Location
- Alameda County, California
Details
Who’s behind it
- Developer
- WM Renewable Energy LLC · part of Waste Management IncOwnership claimOwnership link recorded from its source; no date stated by the source.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Biomass source: “Landfill Gas”
- Capacity (MW)
- 4.8 Capacity is the sum of the 3 generators listed under Sources.
- EIA plant
- 57164 3 generatorsEIA generatorsPlant 57164 GEN1, GEN2, GEN3
Timeline
- Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Fremont CA AutoFactory Under construction | Solar | 2.3 mi | 3.8 |
| 7999 Gateway Solar Under construction | Solar | 3.4 mi | 4.6 |
| Gateway#1&2 (Newark CA) Announced | Solar | 5.1 mi | 1.1 |
| SJC02 & SJC03 DATA CENTER Unknown | Large load | 6.1 mi | |
| 888 Ross Data Center Filed | Large load | 7.2 mi | |
| EDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT Unknown | Large load | 7.9 mi | |
| Edgecore -3580 Filed | Large load | 7.9 mi | |
| SV8 DATA CENTER Unknown | Large load | 8.3 mi | |
| LBA Data Center West Filed | Large load | 8.5 mi | |
| Kifer BESS 1 Under construction | Storage | 8.6 mi | 50 |
| VANTAGE DATA CENTERS MANAGEMENT CO , LLC Unknown | Large load | 8.6 mi | |
| 4054 Digital Realty Built | Large load | 8.8 mi | |
| PRIME DATA CENTERS Built | Large load | 9.1 mi | |
| 1200 Memorex Skybox Data Center Filed | Large load | 9.3 mi | |
| SKYBOX DATA CENTER Built | Large load | 9.5 mi | |
| HAYWARD DATA CENTER Unknown | Large load | 11.3 mi | |
| DC-N (San Jose data centre) Filed | Large load | 11.9 mi | |
| Data Center Filed | Large load | 12.8 mi |
Sources EIA-860M · EPA ICIS-NPDES · FAA OE/AAA · CAISO · EPA ICIS-Air