Show on map
Sand Hill — Power plant · Gas, combined cycle · Austin EnergyAustin TX GigaFactory — Under construction · Solar · TX · 2.3 MW · 0.8 mi awayAustin TX GigaFactory — Postponed · Solar · TX · 1 MW · 0.8 mi awaySMT DC Austin I (Austin data centre) — Filed · Large load · TX · 4.2 mi awayAMD Phase 2 (Austin data centre) — Filed · Large load · TX · 4.7 mi awayDogwood Creek Solar and BESS — Postponed · Solar + storage · TX · 878.7 MW · 13.8 mi awayPecan Crossing Building 2 (Pflugerville data centre) — Filed · Large load · TX · 14.3 mi awayMetro BESS — Studied · Storage · TX · 200.7 MW · 14.8 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 32% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2001
Net generation, 2025
1,960,692 MWh
Grid
138 kV to Austin Energy (ERCO)
Location
Travis County, Texas
Operated by
Austin EnergySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2002 to 2026
Fuel burned MMBtu by year, 2002 to 2026
  • Gas

Operations detail

Details

Who’s behind it

Owner
Austin EnergySource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
25 years since 2001
Unused energy
4,140 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
8,458 Btu/kWh 2025
All 8 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Austin Energy Corp
Share pct
100
Gem entity id
E100000002179
Unit ids
G100000402184, G100000402492, G100000402493, G100000402494, G100000402495, G100000402496, G100000402497
Location id
L100000401733
Eia plant ids
5, 7900
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
Austin Energy
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110071161706
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000669
Fuel burned (MMBtu), 202516,582,792
Capacity factor, 20250.321
Heat rate (Btu/kWh), 20258,457.6
Net generation (MWh), 20251,960,692
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Austin TX GigaFactory × 2 units Under construction Solar 0.8 mi 3.3
SMT DC Austin I (Austin data centre) Filed Large load 4.2 mi
AMD Phase 2 (Austin data centre) Filed Large load 4.7 mi
Dogwood Creek Solar and BESS Postponed Solar + storage 13.8 mi 878.7
Pecan Crossing Building 2 (Pflugerville data centre) Filed Large load 14.3 mi
Metro BESS Studied Storage 14.8 mi 200.7

Sources EIA-860M · FAA OE/AAA · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 9, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution