Sand Point — Power plant · Oil · Sand Point Generating, LLC
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 11% of 2025 Out of service
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2000
Net generation, 2025
3,681 MWh
Grid
0.5 kV to TDX Sand Point Generating, LLC
Location
Aleutians East County, Alaska
Operated by
Sand Point Generating, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2019 to 2025
Fuel burned MMBtu by year, 2019 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
26 years since 2000
Heat rate
9,951 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Eia status
By code
OP
Mw
1.80
Units
3
OS
Mw
1
Units
2
SB
Mw
0.900
Units
1
Standby mw
0.900
Status rule
majority_mw_out_of_service
In service mw
3.70
Out of service mw
1
Fuel burned (MMBtu), 202536,631
Capacity factor, 20250.114
Heat rate (Btu/kWh), 20259,951.4
Net generation (MWh), 20253,681

Retirement

Capacity retired
0.7 MW
Generators retired
1
Capacity still in service
3.7 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
5Petroleum Liquids0.7 MWRetiredFebruary 2023

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
0 kV
Transmission or distribution system owner
TDX Sand Point Generating, LLC
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 5 scheduled to retire, 0.7 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory