- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
Sand Point: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Sand Point
Power plant · Oil
Key facts
Power plant · Oilran 11% of 2025 Out of service- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2000
- Net generation, 2025
- 3,681 MWh
- Grid
- 0.5 kV to TDX Sand Point Generating, LLC
- Location
- Aleutians East County, Alaska
- Operated by
- Sand Point Generating, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 26 years since 2000
- Heat rate
- 9,951 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 36,631 |
| Capacity factor, 2025 | 0.114 |
| Heat rate (Btu/kWh), 2025 | 9,951.4 |
| Net generation (MWh), 2025 | 3,681 |
Retirement
- Capacity retired
- 0.7 MW
- Generators retired
- 1
- Capacity still in service
- 3.7 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 5 | Petroleum Liquids | 0.7 MW | Retired | February 2023 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 0 kV
- Transmission or distribution system owner
- TDX Sand Point Generating, LLC
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 5 scheduled to retire, 0.7 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory