- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
Seaside Heights Power Plant: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Seaside Heights Power Plant
Power plant · Oil
Key facts
Power plant · Oil Out of service- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2012
- Net generation, 2025
- 0 MWh
- Grid
- 4 kV to Seaside Heights Municipal Utility (PJM)
- Location
- Ocean County, New Jersey
- Operated by
- Seaside Heights Municipal Utility (NJ)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 0
MWh - Fuel burned, 2025
- 0
MMBtu - Capacity factor, 2025
- Not stated
- Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 0 | 0 | — | — |
| 2024 | 0 | 0 | — | — |
| 2023 | 0 | 0 | — | — |
| 2022 | 0 | 0 | — | — |
| 2021 | 0 | 0 | — | — |
| 2020 | 0 | 0 | — | — |
| 2019 | 0 | 0 | — | — |
| 2018 | 0 | 0 | — | — |
| 2017 | 0 | 0 | — | — |
| 2016 | 301 | 3,582 | 0.6% | 11,900 |
| 2015 | 96 | 165 | 0.2% | — |
| 2013 | 13 | 1,766 | 0.0% | — |
| 2012 (4 of 12 months) | 186 | 2,417 | — | 12,995 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.