SECC
Power plant · Oil
Key facts
Power plant · Oil Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1998
- Grid
- 34 kV to City of Colorado Springs - (CO) (WACM)
- Location
- El Paso County, Colorado
- Operated by
- City of Colorado Springs - (CO)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 28 years since 1998
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | WACM |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- April 2014
- Capacity retired
- 1.5 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Petroleum Liquids | 1.5 MW | Retired | April 2014 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 34 kV
- Transmission or distribution system owner
- City of Colorado Springs - (CO)
- Balancing authority
- Western Area Power Administration - Rocky Mountain Region
- NERC region
- WECC
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 1 scheduled to retire, 1.5 MW · EIA-860M
- In service · EIA-860M
Sources
2 sourcesAround this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| QTS COLORADO SPRINGS I - DATA CENTER Built | Large load | 3.9 km | |
| VERIZON WIRELESS - DATA CENTER Built | Large load | 4.6 km | |
| COS01 DATA CENTER Built | Large load | 9.7 km | |
| VINEYARD DATA CENTER Built | Large load | 11.1 km | |
| COS02 DATA CENTER Built | Large load | 12.2 km | |
| NOVVA COLORADO - DATA CENTER CO SPRINGS Built | Large load | 14.6 km | |
| Horizon Announced | Gas, combustion turbine | 17.7 km | 480 |
| Drennan Energy Storage Filed | Storage | 17.8 km | 100 |