Second Division Solar: location and 10 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Second Division Solar
Power plant · Solar
Key facts
Power plant · Solarran 22% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2024
- Net generation, 2025
- 190,835 MWh
- Grid
- 138 kV to CenterPoint Energy (ERCO)
- Location
- Brazoria County, Texas
Output
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 2 years since 2024
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 651,129 |
| Capacity factor, 2025 | 0.218 |
| Net generation (MWh), 2025 | 190,835 |
| Balancing authority code | ERCO |
Solar arrays
Solar arrays
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 446.4
- AC capacity (MW)
- 100
- DC capacity (MW)
- 125
- Mounting
- Single-axis tracking
- Site type
- Greenfield
- Began operating
- 2024
Source USPVDB
Source
- U.S. Large-Scale Solar Photovoltaic DatabaseMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
Ownership
3 companies3| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Lightsource Renewable Energy Asset Management, LLC | Operator | EIA-860M | ||
| TX Gulf Solar I, LLC | Owner | 100.0% | 31 Dec 2025 | EIA-860 |
| Mound Creek Storage, LLC | Owner | 31 Dec 2025 | EIA-860 |
Timeline
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- U.S. Large-Scale Solar Photovoltaic Database (USPVDB) — USGS and LBNL; one row per facility with its array footprintMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Second Division Solar Studied | Storage | 0.0 km | 30 |
| Bell Creek BESS LLC Contracted | Storage | 8.0 km | 200.9 |
| Castor Under construction | Storage | 9.1 km | 200 |
| Elio Energy LLC Contracted | Storage | 10.2 km | 205.3 |
| Brazos River BESS LLC Contracted | Storage | 11.9 km | 180.4 |
| Wittig Solar Park Permitted | Solar | 15.4 km | 106.9 |
| Pledger Under construction | Storage | 16.7 km | 9.5 |
| Nash Solar Under construction | Solar | 16.9 km | 10 |
| GulfStar Power, LLC Under construction | Solar | 22.1 km | 451.6 |
| Rock Rose Energy Storage Under construction | Storage | 25.0 km | 208.5 |