Show on map
Security — Power plant · Biomass · TX LFG Energy, LPLupinus Solar 1, LLC — Solar + storage · TX · 246.3 MW · 2.4 km awayLupinus Solar 2, LLC — Solar + storage · TX · 366.9 MW · 2.4 km away
  • Wind & solar
  • Bioenergy
  • In development
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Biomass

Key facts

Power plant · Biomassran 11% of 2024 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2003
Net generation, 2024
6,240 MWh
Grid
12 kV to Sam Houston Electric Coop Inc (MISO)
Location
Montgomery County, Texas
Operated by
TX LFG Energy, LPSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2003 to 2024
Fuel burned MMBtu by year, 2003 to 2024
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
23 years since 2003
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
April 2024
First unit retired
July 2004
Capacity retired
6.4 MW
Generators retired
4
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
UNT1Landfill Gas1.3 MWRetiredJuly 2004
UNT3Landfill Gas1.7 MWRetiredOctober 2019
GEN5Landfill Gas1.7 MWRetiredApril 2024
UNT2Landfill Gas1.7 MWRetiredApril 2024

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
12 kV
Transmission or distribution system owner
Sam Houston Electric Coop Inc
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
SERC
Transmission lines within 25 km (10)
Connection points within 25 km (2)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units GEN5, UNT2 scheduled to retire, 3.4 MW · EIA-860M
  • Stated Unit UNT3 scheduled to retire, 1.7 MW · EIA-860M
  • Stated Unit UNT1 scheduled to retire, 1.3 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · OpenStreetMap · ERCOT · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

© OpenStreetMap contributors

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Lupinus Solar 1, LLC Under construction Solar + storage 2.4 km 246.3
Lupinus Solar 2, LLC Contracted Solar + storage 2.4 km 366.9

Sources ERCOT · EIA-860M

Sources

Attribution