SEGS V: location and 1 exact-grade project within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
SEGS V
Power plant · Solar thermal
Key facts
Power plant · Solar thermal Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1987
- Net generation, 2020
- 0 MWh
- Location
- San Bernardino County, California
- Operated by
- FPL Energy Operating Services Inc - SEGS
Output
- Gas
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar thermal source: “Solar Thermal without Energy Storage”
- Age
- 39 years since 1987
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Balancing authority code | CISO |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- July 2021
- Capacity retired
- 34.2 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN1 | Solar Thermal without Energy Storage | 34.2 MW | Retired | July 2021 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- CISO
Transmission lines within 25 km (10)
Connection points within 25 km (1)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
4 companies4| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| FPL Energy Operating Services Inc - SEGS | Operator | EIA-860M | ||
| FORTRESS INVESTMENT GROUP | Owner | 49.3% | 31 Dec 2023 | EPA GHGRP |
| Exelon | Owner | 4.2% | 31 Dec 2023 | EPA GHGRP |
| NextEra Energy | Owner | 45.0% | 31 Dec 2023 | EPA GHGRP |
Timeline
- Stated Unit GEN1 scheduled to retire, 34.2 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- CAISO Public Queue ReportSource: California ISO
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Overnight Solar Under construction | Solar + storage | 18.1 km | 150 |
Sources
- CAISO Public Queue ReportSource: California ISO
- EIA-860M Preliminary Monthly Electric Generator Inventory