Show on map
Seiling Wind I — Power plant · Wind · NextEra Energy Seiling WindVici Wind Farm — Postponed · Wind · OK · 180 MW · 8.3 mi away
  • Wind & solar
  • Operating
  • 10 · 100 · 1,000 MW

Seiling Wind I

Power plant · Wind

Key facts

Power plant · Windran 26% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2014
Net generation, 2025
454,051 MWh
Grid
345 kV to Oklahoma Gas & Electric Co (SWPP)
Location
Dewey County, Oklahoma
Operated by
NextEra Energy Seiling WindSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2014 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
12 years since 2014
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
MRO
Report year
2025
Grid voltage kv
345
Transmission owner
Oklahoma Gas & Electric Co
Balancing authority code
SWPP
Balancing authority name
Southwest Power Pool
Fuel burned (MMBtu), 20251,549,221
Capacity factor, 20250.261
Net generation (MWh), 2025454,051
Balancing authority codeSWPP

Wind turbines

Turbines
117
Turbine capacity (MW)
198.9
Turbine models
117 GE Wind GE1.7-100
Hub height (m)
80
Rotor diameter (m)
100
Year online
2014

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Vici Wind Farm Postponed Wind 8.3 mi 180

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution