Show on map
- Combustion
- Loads
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Loads
- Operating
- Size not stated
Shelby, Toms Street: location and 8 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Shelby, Toms Street
Power plant · Oil
Key facts
Power plant · Oil Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2002
- Net generation, 2025
- -39 MWh
- Grid
- 12 kV to City of Shelby - (NC) (DUK)
- Location
- Cleveland County, North Carolina
- Operated by
- North Carolina Mun Power Agny #1SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 24 years since 2002
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 6 |
| Net generation (MWh), 2025 | -39 |
| Balancing authority code | DUK |
Data notes (2)
- Capacity factor, 2025 not shown: net generation -39.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
- Heat rate (Btu/kWh), 2025 not shown: fuel burned but net generation is not positive
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| High Pockets Solar Postponed | Solar | 5.8 mi | 1.9 |
| Peanut Solar Postponed | Solar | 6.1 mi | 5 |
| Bradley Farm Postponed | Solar | 7.0 mi | 5 |
| BELLSOUTH TELECOMMUNICATIONS, LLC DBA AT&T NORTH CAROLINA Built | Large load | 8.5 mi | |
| Cleveland Cnty Generating Facility Postponed | Gas, combustion turbine | 11.0 mi | 736 |
| Innovative Solar 33 Postponed | Solar | 13.9 mi | 30.5 |
| Tower Solar Center LLC Postponed | Solar | 14.0 mi | 5 |
| James E. Rogers Energy Complex Postponed | Coal | 14.6 mi | 800 |
Sources EIA-860M · EPA ICIS-Air