Show on map
- Combustion
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
Shepherd Center - Boulevard 230 kV: route and 15 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Shepherd Center - Boulevard 230 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 230 kV
- States crossed
- US-GA
- Owner (as stated)
- Georgia Power
Details
Who’s behind it
- Owner
- Georgia Power
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 2
- Substations at the ends (as the source names them)
- Shepherd Center to Boulevard
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | georgia power |
| HIFLD line ID | 117484 |
| Voltage class | 220-287 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| DATA CENTER ATLANTA, LLC Built | Large load | 1.6 mi | |
| QUALITY INVESTMENT PROPERTIES METRO, LLC Built | Large load | 2.9 mi | |
| Leibherr LR 1400 (Atlanta data centre) Filed | Large load | 3.5 mi | |
| TA Reality Ellenwood Data Center Filed | Large load | 10.8 mi | |
| FT GIllem MASE Crane (Forest Park data centre) Filed | Large load | 11.1 mi | |
| DeKalb County Green Energy Facility Postponed | Biomass | 11.2 mi | 1.6 |
| GOOGLE, INC. Built | Large load | 11.7 mi | |
| ATL11 DATA CENTER Built | Large load | 12.6 mi | |
| ROCK HOUSE ROAD DATA CENTER Under construction | Large load | 12.7 mi | |
| Vantage Data Center Crane Under construction | Large load | 12.9 mi | |
| ATL06 DATA CENTER Under construction | Large load | 13.3 mi | |
| ALIGNED DATA CENTERS ATL01 Built | Large load | 14.1 mi | |
| TRAVELERS DATA CENTER Built | Large load | 14.2 mi | |
| FTY01 DATA CENTER Under construction | Large load | 14.2 mi | |
| Solar BESS Hybrid Under construction | Gas, combustion turbine | 14.8 mi | 6 |
Sources EPA ICIS-Air · FAA OE/AAA · EIA-860M · EPA ICIS-NPDES · Georgia EPD
Sources
- EPA ICIS-Air
- FAA OE/AAA
- EIA-860M
- EPA ICIS-NPDES
- Georgia EPDSource: Georgia Environmental Protection Division, Air Protection Branch