Show on map
Sherbino Ii 138 kV line — Transmission lineGreenalia Solar Power Blackwelder Ranch — Announced · Solar · TX · 199.7 MW · 11.1 mi awayBlackwelder Ranch Wind — Announced · Wind · TX · 110.4 MW · 11.1 mi awayRE Maplewood — Postponed · Solar · TX · 300 MW · 12.0 mi away
  • Wind & solar
  • In development
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Sherbino Ii 138 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
10
Substations at the ends (as the source names them)
Sherbino Ii
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID302740
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Greenalia Solar Power Blackwelder Ranch Announced Solar 11.1 mi 199.7
Blackwelder Ranch Wind Announced Wind 11.1 mi 110.4
RE Maplewood Postponed Solar 12.0 mi 300

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution