Show on map
Short Mountain — Power plant · Biomass · Emerald People's Utility Dist
  • Bioenergy
  • Operating
  • 10 · 100 · 1,000 MW

Short Mountain

Power plant · Biomass

Key facts

Power plant · Biomassran 89% of 2025 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1992
Net generation, 2025
25,019 MWh
Grid
21 kV to Emerald People's Utility Dist (PACW)
Location
Lane County, Oregon

Output

Net generation MWh by year, 2002 to 2025
Fuel burned MMBtu by year, 2002 to 2025
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
34 years since 1992
Heat rate
13,936 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110043783180
Subparts reported
HH
NAICS code
562212
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1007001
Fuel burned (MMBtu), 2025348,668
Capacity factor, 20250.892
Heat rate (Btu/kWh), 202513,936.1
Net generation (MWh), 202525,019
Balancing authority codePACW

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Next scheduled retirement
December 2027
Capacity scheduled to retire
3.2 MW
Generators scheduled to retire
4
Share of in-service capacity scheduled
100%
Capacity still in service
3.2 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Landfill Gas0.8 MWScheduled to retireDecember 2027
2Landfill Gas0.8 MWScheduled to retireDecember 2027
3Landfill Gas0.8 MWScheduled to retireDecember 2027
4Landfill Gas0.8 MWScheduled to retireDecember 2027

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
21 kV
Transmission or distribution system owner
Emerald People's Utility Dist
Balancing authority
PacifiCorp - West
NERC region
WECC
Transmission lines within 15 mi (3)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Emerald People's Utility Dist Operator EIA-860M
COUNTY OF LANE OREGON Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units 1, 2, 3, 4 scheduled to retire, 3.2 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source