Silas Ray
Power plant · Gas, combined cycle
Key facts
Power plant · Gas, combined cycleran 4% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1959
- Net generation, 2025
- 51,943 MWh
- Grid
- 138 kV to Brownsville Public Utilities Board (ERCO)
- Location
- Cameron County, Texas
- Operated by
- Brownsville Public Utilities Board
Output
- Gas
- Oil
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
- Age
- 67 years since 1959
- Unused energy
- 1,196 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 13,234 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 687,391 |
| Capacity factor, 2025 | 0.042 |
| Heat rate (Btu/kWh), 2025 | 13,233.6 |
| Net generation (MWh), 2025 | 51,943 |
| Balancing authority code | ERCO |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 27.9 MW
- Generators retired
- 4
- Capacity still in service
- 142.5 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 5 | Natural Gas Steam Turbine | 24 MW | Retired | April 2016 |
| DG-2 | Petroleum Liquids | 1.3 MW | Retired | May 2019 |
| DG-7a | Petroleum Liquids | 1.3 MW | Retired | May 2019 |
| DG-7b | Petroleum Liquids | 1.3 MW | Retired | May 2019 |
By technology
| Technology | Retired | Scheduled to retire |
|---|---|---|
| Natural Gas Steam Turbine | 24 MW | |
| Petroleum Liquids | 3.9 MW |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 138 kV
- Transmission or distribution system owner
- Brownsville Public Utilities Board
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
Transmission lines within 25 km (10)
- 138 kV line (OSM way 513680404)
- 69 kV line (OSM way 513680403)
- 138 kV line (OSM way 1448528554)
- 69 kV line (OSM way 513680334)
- 138 kV line (OSM way 513680336)
- 138 kV line (OSM way 513680337)
- 138 kV line (OSM way 513680394)
- 138 kV line (OSM way 513680395)
- 138 kV line (OSM way 513680340)
- 138 kV line (OSM way 513680393)
Connection points within 25 km (1)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Brownsville Public Utilities Board | Operator | EIA-860M | ||
| PUBLIC UTILITIES BOARD OF THE CITY OF BROWNSVILLE TEXAS | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- Stated Units DG-2, DG-7a, DG-7b scheduled to retire, 3.9 MW · EIA-860M
- Stated Unit 5 scheduled to retire, 24 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · OpenStreetMap · ERCOT · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
© OpenStreetMap contributors
Sources
- EIA-860M
- OpenStreetMap© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
- ERCOT
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Hecate Grid East Valley Storage Announced | Storage | 3.3 km | 255 |
| Resaca Oasis Storage Contracted | Storage | 16.6 km | 200.7 |