- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
Silverhawk: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Silverhawk
Power plant · Gas, combined cycle
Key facts
Power plant · Gas, combined cycleran 25% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2004
- Net generation, 2025
- 2,476,913 MWh
- Grid
- 500 kV to Nevada Power Co (NEVP)
- Location
- Clark County, Nevada
- Operated by
- Nevada Power Co
Operations
- Net generation, 2025
- 2,476,913
MWh - Fuel burned, 2025
- 19,443,750
MMBtu - Capacity factor, 2025
- 25.2
% - Heat rate, 2025
- 7,850
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2026 (8 of 12 months) | 2,113,813 | 16,872,393 | — | 7,982 |
| 2025 | 2,476,913 | 19,443,750 | 25.2% | 7,850 |
| 2024 | 2,852,939 | 22,331,763 | 29.0% | 7,828 |
| 2023 | 2,570,246 | 18,632,763 | 26.2% | 7,249 |
| 2022 | 1,801,968 | 14,322,522 | 18.4% | 7,948 |
| 2021 | 1,628,992 | 12,798,399 | 16.6% | 7,857 |
| 2020 | 2,546,077 | 19,830,926 | 25.9% | 7,789 |
| 2019 | 1,795,018 | 13,818,988 | 18.3% | 7,698 |
| 2018 | 1,550,076 | 11,754,125 | 15.8% | 7,583 |
| 2017 | 2,233,044 | 17,317,282 | 22.8% | 7,755 |
| 2016 | 2,704,702 | 20,559,032 | 27.5% | 7,601 |
| 2015 | 2,566,599 | 19,413,600 | 26.2% | 7,564 |
| 2014 | 1,047,368 | 8,346,311 | 10.7% | 7,969 |
| 2013 | 2,297,131 | 17,762,155 | 23.4% | 7,732 |
| 2012 | 1,786,198 | 13,803,331 | 18.1% | 7,728 |
| 2011 | 1,981,449 | 15,516,508 | 20.2% | 7,831 |
| 2010 | 2,577,652 | 19,837,856 | 26.3% | 7,696 |
| 2009 | 2,361,408 | 17,919,691 | 24.1% | 7,589 |
| 2008 | 3,288,367 | 24,811,357 | 33.4% | 7,545 |
| 2007 | 2,889,329 | 21,579,801 | 29.4% | 7,469 |
| 2006 | 2,990,114 | 23,356,893 | 30.5% | 7,811 |
| 2005 | 2,621,599 | 19,956,643 | 26.7% | 7,612 |
| 2004 (8 of 12 months) | 1,164,677 | 9,123,756 | — | 7,834 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.
Sources
3 sourcesSources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)