Show on map
Singleton 345 kV line — Transmission lineJohn Paul Jones — Postponed · Gas, reciprocating engine · TX · 18.7 MW · 0.1 mi awaySMT DC Houston 1 (Tomball data centre) — Filed · Large load · TX · 1.2 mi awayBlue Jay Solar I, LLC — Under construction · Solar · TX · 210 MW · 6.5 mi awaySERVERFARM LONGHORN — Under construction · Large load · TX · 6.9 mi awayRatcliff Solar Park — Permitted · Solar · TX · 85.7 MW · 7.2 mi awayMount Whitney BESS — Under construction · Storage · TX · 11 MW · 15.0 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Singleton 345 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-TX
Owner (as stated)
Entergy Texas

Details

Who’s behind it

Owner
Entergy Texas

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
47
Substations at the ends (as the source names them)
Singleton
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itentergy texas
HIFLD line ID302403
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
John Paul Jones Postponed Gas, reciprocating engine 0.1 mi 18.7
SMT DC Houston 1 (Tomball data centre) Filed Large load 1.2 mi
Blue Jay Solar I, LLC Under construction Solar 6.5 mi 210
SERVERFARM LONGHORN Under construction Large load 6.9 mi
Ratcliff Solar Park Permitted Solar 7.2 mi 85.7
Mount Whitney BESS Under construction Storage 15.0 mi 11

Sources EIA-860M · FAA OE/AAA · ERCOT · EPA ICIS-NPDES

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 13, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026

Attribution