Show on map
SJRR (LIG) — Power plant · Gas, combustion turbine · SJRR Power LLCCPV Pondera King Energy Center — Postponed · Gas, combined cycle · TX · 900 MW · 6.6 mi awayGreens Bayou 6 — Under construction · Gas, combustion turbine · TX · 445 MW · 7.6 mi awayNoor Solar — Filed · Solar · TX · 188.2 MW · 8.8 mi awayTX Houston 7080 Express Lane — Postponed · Storage · TX · 1.5 MW · 9.0 mi awayGCCISD NEW TECHNOLOGY DATA CENTER — Large load · TX · 10.9 mi awayConeflower Storage Project LLC — Contracted · Storage · TX · 170.8 MW · 11.3 mi awayTX LaPort 10060 Porter Road Solar — Postponed · Solar · TX · 1.6 MW · 13.0 mi awayCedar Bayou 5 — Under construction · Gas, combustion turbine · TX · 697 MW · 14.6 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 8% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2022
Net generation, 2025
74,098 MWh
Grid
138 kV to CenterPoint Energy (ERCO)
Location
Harris County, Texas
Operated by
SJRR Power LLC

Output

Net generation MWh by year, 2022 to 2025
Fuel burned MMBtu by year, 2022 to 2025
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
4 years since 2022
Unused energy
802 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
11,787 Btu/kWh 2025
All 8 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
NRG Energy Inc
Share pct
100
Gem entity id
E100000001262
Unit ids
G100000403843, G100000403844
Location id
L100000402430
Eia plant ids
62548
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
CenterPoint Energy
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110070665612
Subparts reported
D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1014345
Fuel burned (MMBtu), 2025873,420
Capacity factor, 20250.085
Heat rate (Btu/kWh), 202511,787.4
Net generation (MWh), 202574,098
Balancing authority codeERCO

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
SJRR Power LLC Operator EIA-860M
ROCKLAND CAPITAL LLC Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CPV Pondera King Energy Center Postponed Gas, combined cycle 6.6 mi 900
Greens Bayou 6 Under construction Gas, combustion turbine 7.6 mi 445
Noor Solar Filed Solar 8.8 mi 188.2
TX Houston 7080 Express Lane Postponed Storage 9.0 mi 1.5
GCCISD NEW TECHNOLOGY DATA CENTER Unknown Large load 10.9 mi
Coneflower Storage Project LLC Contracted Storage 11.3 mi 170.8
TX LaPort 10060 Porter Road Solar Postponed Solar 13.0 mi 1.6
Cedar Bayou 5 Under construction Gas, combustion turbine 14.6 mi 697

Sources EIA-860M · ERCOT · EPA ICIS-NPDES

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026

Attribution